Technical Fabrication | Industrial | Agricultural | Construction

Tube Rolling of a Fighter Training Machine for the Martial Arts Industry

(Click on thumbnail to enlarge)

Custom Fabricated Prototype Training Machine
Custom Fabricated Prototype Training Machine

At Technical Fabrication, we provide custom fabricated products for a wide range of industries and applications. The project highlighted here was designed for use as a martial arts fighter training machine, it was composed of A-500, and A-36 steel, and utilized a number of our metal forming capabilities. The complexity of this product required the assignment of a dedicated engineer to oversee construction.

The steel that comprised the three main assemblies were cut to size with a combination of an oxy/acetylene torch, plasma cutter, and shear. The sections were formed with our press brake, which was used to bump roll. All components were welded and fully ground smooth prior to the application of a durable black powder coat finish. Vibration testing was performed throughout the fabrication process, as well as dimensional inspections which were in full compliance with ASME Y14.5M-1994 standards. We fabricated two prototypes from the customers engineering drawings in only 8 to 10 weeks. For more information on this project, or the processes used to fabricate, see the table below or contact us directly.

Request A Quote

Highlights of this Custom Steel Tube Fabrication Project

Product Description This training machine is used to help mixed martial arts fighters work out.
Steel Tube Fabrication Capabilities Applied/Processes Primary:
Tube Rolling
  • Used Press Brake To Bump Roll
  • Burning and Rolling Pieces by Hand
Secondary:
Assembly - Welder and Grinder
Equipment Used to Manufacture Part Shear, Press Brake, Grinder, Welder OXY / Acetylene Torch, Plasma Cutter Hand Held
Overall Part Dimensions Vertical Main Support
Tightest Tolerances ±.030"
Material Used A-500, A-36 Steel
Material Finish Black Powder Coat
Components Frame Base Assembly - 72" x 108"
VIPCM Top Assembly - 90"
Vertical Main Support - 90"
In process testing/inspection performed Vibration Tests Performed at Different Stages by a Computer Engineer Assigned to This Project
Industry for Use Martial Arts Industry
Fitness Industry
Volume 2 Prototypes
Delivery/Turnaround Time 8 - 10 Weeks
Delivery Location Palo Alto, California
Standards Met Customer supplied print, 2D CAD Drawing
ASME Y14.5M-1994
Product Name Fighter Training Machine

View Other Portfolio

back to top

Privacy Policy     SitemapCopyright © 2013 Technical Fabrication, All Rights Reserved.
Site created by Thomas Web Solutions